©2003UUllttiimmaattee UUllttiimmaattee Carl Goldberg Products Ltd.30%10-300CARL GOLDBERG PRODUCTS, LTD.P.O. Box 818 Oakwood, GA 30566 Phone # 6
1030% Ultimate ARFFit the I-Struts in place paying atten-tion to left and right and top and bot-tom. The I-Struts have recesses inthem that fit over t
1130% Ultimate ARFControl SurfacesLocate the predrilled hole for theaileron, elevator, and rudder horns.Open the hole up with a 9/64” drill.Locate the
1230% Ultimate ARFLocate the two landing gear legsand the two 1”aluminum angles.Using four 6-32x3/4” socket headcap screws, four #6 washers, andfour 6
1330% Ultimate ARFFlat part of gear leg must be parallel to center line of air-plane. Align the gear so the outside holewill go through the center of
1430% Ultimate ARFLocate the tail wheel bracket andalign the bend in the strut at therear of the fuselage. Center themount on the fuselage and drill t
1530% Ultimate ARFDrill a 1/2” hole at the dimple on theside with the wood block. If you havea forstner bit you can drill the 1/2”hole directly, if u
1630% Ultimate ARFCowl MountingSlide the cowl into place and markthe location of the landing gear onthe bottom. Using a dremel tool, cutslots in the c
1730% Ultimate ARFEngine mountingLocate the firewall, motor box cov-ers, tri stock, and top firewall sup-ports.With the cowl mounted, measurefrom the
1830% Ultimate ARFEpoxy the firewall in place makingsure to keep it square with the sides.Add the triangle top supports onboth sides and the tri stock
1930% Ultimate ARFShim the engine out if necessary toget approximately 1/8” clearance.Move the engine left or right and upand down till the spinner ba
230% Ultimate ARFWARNING! THIS IS NOT A TOY!THIS IS NOT A BEGINNERS AIRPLANEThis R/C kit and the model you will build from it is not a toy! It is cap
2030% Ultimate ARFLocate the fuel tank and hardware. Assemble the tank with three lines.Take one of the pieces of brass tubeand cut into two equal len
2130% Ultimate ARFPlace the tank between the holesand use the two 14” tie wraps tosecure the tank to the mount.Servo mountingLocate the laser cut thro
2230% Ultimate ARFLocate the two servo cutouts oneach side of the fuselage just underthe stab. Remove the covering with asharp knife. Install the two
2330% Ultimate ARFLocate the four aileron servocutouts in the bottom side of bothwings. Remove the covering with asharp knife. You will need four 14”s
2430% Ultimate ARFTrim the clear canopy to fit hatch.Install pilot(not supplied) if desired.Canopy should fit flush with the tur-tledeck bulkhead at t
2530% Ultimate ARFminutes. Shut the engine down andcheck all your bolts, clevises, servosand linkage. Pull the wing off andcheck all the attach points
330% Ultimate ARF30% Ultimate ARF 3-D ARF30% Ultimate ARF 3-D ARFCongratulations on your purchase of the Goldberg Ultimate ARF 3-D ARF.This is a very
430% Ultimate ARFParts Layout1.Fuselage2.Removable cockpit3.Cowl4.Top wing5.Bottom wing6.Rudder7.Stabilizer8.Elevator (2)9.I-Struts (2)10.Clear Canopy
530% Ultimate ARFHardware List Quantity per kit Use6-32x3/4" Socket head screws 20 2 canopy hold down8 I-Struts4 cabane struts at fuselage2 top
630% Ultimate ARF#6 flat washers 17 8 Control horns4 Landing gear aluminum angles5 cowl mount4-40 golden clevis 16 8 aileron4 elevator4 rudder 4-40 j
730% Ultimate ARFBUILDINGINSTRUCTIONSBefore starting to build this kit, weurge you to read through theseinstructions. They contain someimportant buil
830% Ultimate ARFRemove the stab and using a sharp#11 blade, cut the covering about1/8” inside the line you drew andremove the covering. Be careful an
930% Ultimate ARFTake a straight pin and stick throughthe blind nut inside the fuselage tolocate the holes for the struts. Using the four 6-32x3/4” so
Comments to this Manuals